view README @ 8:cf915ece9e48

Remove "week day" from the TIME response The week day item in the TIME response is useless. Drivewire 4 doesn't return it and since that is the most common Drivewire implementation, it makes sense to conform to that definition.
author William Astle <lost@l-w.ca>
date Sat, 16 Jul 2016 18:56:01 -0600
parents bef2801ac83e
children
line wrap: on
line source

The docs/ folder contains protocol documentation for lwwire.

The src/ folder contains a reference protocol implementation. This is NOT
intended for casual users. It is meant to serve as an illustration of how
the protocol can be implemented and serves as a means to test features. The
reference implementation does not contain a fancy GUI, configuration file
handler, or even serial or TCP port handling. It simply operates the
protocol on stdin and stdout and prints diagnostics to stderr. A tool like
socat can be used to link it to a TCP port. Similar tools might be used to
link it to a serial port.